290 Various Jobs VACANCY at JVACEE (Stigler’s Gorge Project)

Posted on

290 Various Jobs VACANCY at JVACEE (Stigler’s Gorge Project)

290 Various Jobs VACANCY at JVACEE (Stigler’s Gorge Project)

JOIN WHATSAPP GROUP HERE  |  JOIN TELEGRAM GROUP HERE

UNAWEZA JIPATIA NOTES ZETU KWA KUCHANGIA KIASI KIDOGO KABISA:PIGA SIMU:0787237719

DOWNLOAD OUR APP CLICK HERE GET JOBS AND SCHOLARSHIP UPDATES DAILY

WARNING
Beware of Job Scammers!
Please Never Pay Money To Get A Job!

 

JVACEE is a Joint venture company of Arab Contractors and El-sewedy Electric, dealing with the scope of Engineering, Procurement & Construction of Julius Nyerere Hydropower Project in Stigler’s Gorge in Tanzania, which is expected to produce 2,115 MW of installed capacity.

290 Various Jobs (ufundi) at JVACEE (Stigler’s Gorge Project) June, 2021. Julius Nyerere Hydropower Station (JNHS; RHHP; Rufiji Hydroelectric Power Project; Stiegler’s Gorge Dam) is a hydroelectric dam under construction across the Rufiji River in eastern Tanzania. Although controversial, the government approved the plans in 2018. The power station is expected to have an installed capacity of 2,115 megawatts (2,836,000 hp) and to produce 5,920GWh of power annually. The project, power station and dam are owned by and will be managed by the government owned Tanzania Electric Supply Company (TANESCO). Construction began in 2019 and is expected to be completed in 2022.

290 Various Jobs VACANCY at JVACEE (Stigler’s Gorge Project)

 

SHARING IS CARING

Leave a Reply

Your email address will not be published. Required fields are marked *